BC Excavation Quote Tool
Free. No signup. BC rates built in.
Job type
Site Prep
Land Clearing
Trenching
Septic Prep
Driveway/Drainage
Custom
Area
square metres
acres
Depth (m, optional)
Vegetation density
Light Brush
Mixed Trees
Heavy Forest
Haul distance (km, one way)
Equipment
Mini Excavator
20-Ton
45-Ton
Skid Steer
Forestry Mulcher
Custom
Equipment hourly rate (CAD, bare)
Operator rate (CAD/hr)
SubTrack BC equipment operator: 100–130, central 115.
Overhead %
Contingency %
Profit %
Technical Safety BC permit fee (150 CAD)
Estimating assumptions (editable defaults, not published rates)
Production, light brush (m²/hr)
Production, mixed trees (m²/hr)
Production, heavy forest (m²/hr)
Swell factor
Truck load (loose m³)
Truck rate with driver (CAD/hr)
SubTrack BC tandem gravel truck with driver: 130–170, central 150.
Truck avg speed (km/h)
Load + dump time per trip (hr)
Disposal fee (CAD per loose m³)
No published BC figure built in. Enter your local tipping fee.
Calculate
Copy breakdown